Nasim SadatandClaude Opus 5.5 97284052c1 atoma dashboards: eligible needs >= 30 matched days; modelled L/h as table B11
SPEC.md follows the owner's decisions of 24 Oct. The "eligible" baseline state
asks for >= 30 matched days (was 60). Modelled L/h is in v1 as table B11 on
Baseline & Evidence (v_modelled_lph): titled as modelled from an assumed
runtime, not measured, and never in S1, the map or the M3 sites list; the
datasets table and acceptance check 4 include it. The migrations are
unchanged: the threshold is applied by the loader's baseline propose, not by
SQL.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>